SB and MSB do not have to be done under sched 5 if they are not listed in the LBS. An AWB is not LAW it is not an AD. If the AD states an SB etc it has to be done. If you run a Manufactures SOM then you MUST comply with the SB etc an ADs.
Its all in the LBS
cheers