This morning's missive, which takes us away from schedule 5 and what a LAME/ owner should or should not do
CASA wishes to advise the opening of:
1. How can the industry deal with changes to the depth as these are? and:
2. Are there enough properly qualified people who can deal with these matters? and:
3. Is this being paid for via the industries $89.9m?