PPRuNe Forums - View Single Post - 3 RUNWAY Operations
View Single Post
Old 26th Apr 2014, 01:27
  #9 (permalink)  
veloo maniam
 
Join Date: Aug 2004
Location: malaysia
Posts: 404
Likes: 0
Received 0 Likes on 0 Posts
3 RWY Ops

A big thank you to all for the replies. Over here at WMKK (KUL) we are entering a new phase of 3 rwy ops on May 1st. We are introducing the
Trombone and Point Merge System. PMS has already been in existence for a while. The only thing was that we tracked acft to a single waypoint and spaced them out intrail at 5NM apart on finals. The new PMS is an arc whereby we will peel them off with the required spacing.ENAV from Italy is about to complete all training.
veloo maniam is offline