PPRuNe Forums - View Single Post - Will both Doha airports be connected?
View Single Post
Old 15th Apr 2014, 08:31
  #12 (permalink)  
thinkofdolphins
 
Join Date: Jul 2004
Location: UAE
Posts: 16
Likes: 0
Received 0 Likes on 0 Posts
This looks relatively formal:

A0170/14 - HAMAD INTL AIRPORT WILL BE OPERATIONAL ON 30 APR 2014 AT 0400 UTC.
ONLY RUNWAY 16L/34R WILL BE OPERATIONAL. PILOTS ARE REMINDED TO
EXERCISE CAUTION NOT TO CONFUSE WITH THE OTHER NON-OPERATIONAL
RUNWAY 16R/34L AND THE RUNWAY IN USE AT DOHA INTERNATIONAL AIRPORT. 30 APR 04:00
2014 UNTIL 28 MAY 23:59 2014. CREATED: 10 APR 06:43 2014
thinkofdolphins is offline