PPRuNe Forums - View Single Post - RAF Rivet Joint
Thread: RAF Rivet Joint
View Single Post
Old 14th Apr 2014, 17:11
  #466 (permalink)  
Lynxman
 
Join Date: Aug 2007
Location: Somerset
Posts: 102
Likes: 0
Received 0 Likes on 0 Posts
RA5101(2) States:

Design Organization Appointment
5101(2) The PTL shall appoint a Design Organization or Co-ordinating Design Organization to be responsible for a particular item or range of items.

A number of responsibilities come with this appointment, notably as stated in the AMC for RA5102(1):

1. When a contractor is appointed Design Organization or Co-ordinating Design Organization, his responsibilities to the MOD should include:
a. Design of the materiel, including all necessary development and testing, to the requirements of the contract specification.
b. Preparation, updating and custody of specifications, drawings and other data associated with the design of the materiel.
c. Preparation, collection, analysis and maintenance of data comprising evidence of design and system safety in accordance with a Safety Management Plan agreed with the PTL.
d. Submission of reports, as required, on progress of the work.
e. Preparing an appropriate certificate of design and its submission for MOD
acceptance (See RA 5103).
f. Ensuring that the design will be suitable for production in facilities agreed between the contractor and MOD.
g. Design of packaging as required for the materiel.
h. Preparation of, or supply of information for, the necessary technical
publications.
i. Collaboration with the relevant PT and it’s agencies in the preparation and provision of information for maintenance of the materiel.
j. Post design services.

The DO must also have DAOS approval.
Lynxman is offline