PPRuNe Forums - View Single Post - RAF Rivet Joint
Thread: RAF Rivet Joint
View Single Post
Old 4th April 2014 | 10:35
  #449 (permalink)  
tucumseh
20 Anniversary
 
Joined: Feb 2003
Posts: 3,311
Likes: 365
From: uk
W

To be entirely fair, I should add that I once saw a vacancy notice at AbbeyWood for a Configuration Manager for EFA (Typhoon). But I often wondered where they got a sufficiently experienced candidate from, given they had graded it very low. Thier counterparts in industry are usually quite senior, same as Risk Managers. Very often the RM is by far the most senior grade in the company team. In MoD it is a peripheral appointment, ditched at the first hint of savings. Always assuming you're given the post in the first place. The two are linked. Failure to maintain CC is ALWAYS a standing risk in MoD.
tucumseh is offline  
Reply