RE NAVY P8
P8 was designed/built to be aerial refueled with long boom typical of Air Force- whereas normal navy is probe and drouge.
It is still in early deployment- some issues with electronic suite still remain
It takes many months of training and certification to do such refueling
Probably not scheduled till 2015-2016 for such training and certification
Only a few have been put into operational use so far.