Start of a momentous year for Carrier project 3 February 2014 David Downs
"...On the upper deck, the catwalks around the edge of the flight deck are being prepared and will shortly be painted with a heat resistant paint scheme. This will survive the thermal effects of the exhaust of an F35 jet while hovering on the approach to a vertical landing. This work also entails application of the thermal metal spray coating to the edges of the flight deck. This coating system will later be applied across the whole flight deck....
...Meanwhile recognising that access to the ship and craneage is much easier while the ship is in the dry dock, served by the Goliath crane, than when afloat in the non-tidal basin, the chance is being taken to install anything that might be difficult to do later. This includes the platform at the stern for the SPN 41 Precision Approach Radar, the seating’s for the Glide Path Cameras and some CCTV cameras. It looks like 2014 is going to be another busy but very interesting year."
Start of a momentous year for Carrier project | Opinion | The Engineer
"Queen Elizabeth in drydock, with the [Lower Portion of the] bow section of Prince of Wales alongside"