PC1 operations are not possible to an ad-hoc site due to the unsurveyed nature (possible hazards, uncertain surface, no lights, estimated size etc) yet EASA NAA's require PC1 for HEMS. This would prohibit practically all HEMS site landings, so PC2 is acceptable at HEMS operating sites.