PPRuNe Forums - View Single Post - Qlink Cobham 717s payload limited
View Single Post
Old 2nd January 2014 | 04:03
  #46 (permalink)  
Capn Bloggs
 
Joined: Mar 2002
: ATPL
Posts: 9,188
Likes: 961
From: Seat 1A
MEL-BNE-MEL, both longer stage lengths than CBR-BNE.
C'Mon Clarrie, sealevel ports with runways longer than 50 MCGs can't be compared to CBR 35 at 35°.
Capn Bloggs is online now  
Reply