PPRuNe Forums - View Single Post - PAPI Night splay
View Single Post
Old 17th Dec 2013, 23:16
  #3 (permalink)  
Damien1989
 
Join Date: Jan 2009
Location: Aus
Posts: 44
Likes: 0
Received 0 Likes on 0 Posts
AIP AD 1.1 - 31 top of the page, refering to T-VASIS & PAPI: "A standard installation aims to provide an obstacle clearance of at least 11m above a 1.9 degree slope within the azimuth splay of 7.5 degrees either side of the runway centreline to a distance of 5nm from the runway threshold (7nm for a runway equipped with an ILS)"
Damien1989 is offline