..ok, fair enough, but my question was what would happen if, following AC Bus 1 failure, Eng Gen 2 fails too. In this case, can Eng Gen 1 supply AC Bus 2 even though AC Bus 1 is faulty? I mean, the relevant contactor seems to be located after the Eng Gen and before the relevant AC Bus (1 or 2), therefore, I reckon, in such a case, Eng Gen 1 can supply the Whole network, except for AC bus 1 which is faulty.
Am I right?