A few minutes on "Bechtel" wikipedia entry is revealing. They seem well qualified. First, some general mismanagement and cost overruns:

The CANOL pipeline contract went to Bechtel-Price-Callahan, a partnership formed for the purpose by the W.A. Bechtel Co., the H.C. Price Co., and the W.E. Callahan Construction Co. In June 1942, the Japanese invaded the Aleutian Islands off the coast of Alaska, and the construction began in earnest. However, due to poor planning by the Army and mismanagement by the contractors, the CANOL project failed totally. The pipeline consumed more oil than it produced and cost taxpayers an enormous amount of money. Furthermore, as time went on, it became clear that the Japanese did not have the resources to invade Alaska. The CANOL pipeline was abandoned after a mere 11 months in operation.

In 1943, the "Truman Committee" released a scathing judgment on the $143 million CANOL project, calling it more destructive to the war effort than any act of sabotage by an enemy. The judgment singled out Bechtel-Price-Callahan for criticism for its role in the cost overruns and mismanagement that plagued the project.

---

In 1981, Bechtel constructed the Ok Tedi Mine, the largest mine in Papua New Guinea at the time. An engineering feat, the mine was constructed in one of the most remote and inaccessible regions in the world. Controversy would surround the major shareholder of the mining company, Broken Hill Proprietary (BHP), which is now known as BHP Billiton, when it allowed mine waste to be dumped directly in the Ok Tedi River after a tailings dam built by Bechtel was destroyed in a landslide. The Ok Tedi Environmental Disaster resulted from the riverine dumping of pollution.

---

In the late 1990s Bechtel was awarded the contract from Saudi Arabia's Civil Aviation Authority to build Dammam's King Fahd International Airport, the largest airport in the world in terms of land area (780 kmē), thus making it larger than the nearby country of Bahrain, that Bechtel completed later than schedule and at a cost that was over budget while bad transport roads led many locals to fly via the nearby Bahrain International Airport.
Note how they treat militarily sensitive information...

According to the Wall Street Journal, Bechtel established a strong relationship with the rebel leader Laurent Kabila during the First Congo War of 1996-7 in central Africa, compiling "the most complete mineralogical and geographical data of the former Zaire ever assembled, information worth a fortune to any prospective mining or oil firm" and commissioning and paying for "U.S. National Aeronautics and Space Administration satellite studies of the country and for infrared maps of its mineral potential." According to government officials, some of the satellite data provided to Kabila by Bechtel was "militarily useful information."
Looks like they can do massive cost overruns in the billions - could come in handy:

In early 2003, the Boston Globe launched an investigation into Bechtel's role in massive cost overruns and accounting irregularities in Boston's Big Dig project totaling over $1 billion. Bechtel rebutted the allegations on its website. The Globe, along with the Associated Press, filed papers requesting that Massachusetts Turnpike Authority make public the results of all Bechtel's performance audits related to the Big Dig. Bechtel sought a preliminary injunction to block the release of the documents, but the superior court judge in the case denied Bechtel's request on April 11, 2003, opening the way for public release of the documents.
Mmm, here's a hint of alleged corruption, mixed with some alleged poor management with a hint of gouging profits through IPR:

Like most large American companies, Bechtel and its employees have contributed large amounts of money to United States politicians (over a million dollars in campaign contributions between 1999 and 2002).
Following the 2003 U.S. invasion of Iraq, George W. Bush awarded the first Iraq reconstruction contract to Bechtel through USAID, on April 20, 2003. This contract was worth an estimated $680 million. It is alleged that some of the construction projects managed by Bechtel were either poorly implemented, failing within months of their installation, or designed in such a way that Iraqi engineers did not have the knowledge or components to fix Bechtel's proprietary technology.
Should be well placed to take on any airworthiness or duty of care issues:

In 2004 BWXT, a partnership of BWX Technologies and Bechtel National are fined $82,500 for a February 2003 accident at Oak Ridge, Tennessee's Y-12 facility after an accident caused a small explosion, a fire, and contaminated three employees.

----

On July 10, 2006 a three ton section of concrete suspended ceiling crashed in the east bound lanes of the Massachusetts Turnpike I-90, in Boston. This tunnel ceiling collapse was in the Big Dig which Bechtel along with Parsons Brinckerhoff were responsible for building. This collapse claimed the life of Melena Del Valle, a 38 year old native of Costa Rica. Massachusetts Attorney General Tom Reily immediately designated the accident scene a crime scene. He has left open the possibility of negligent homicide charges being levied against Big Dig contractors and managers.
And to top it all, this bodes well for a potential single source contract!!!!

In 2005, Bechtel was awarded a no-bid contract by the Federal Emergency Management Agency to install temporary housing for the Hurricane Katrina disaster relief effort. The lack of competitive bidding for the contracts was criticized, as was the high cost of the contracts and the failure to support local, minority-owned businesses.