Foreign registered aircraft, A380s and 747s can't participate in land and hold shorts ops so get the full length of 34 regardless. 16 is probably better as they're through the intersection sooner.
It can increase workload if the sequencing means you're putting aircraft for different runways through the same fixes at the same time, but that's luck of the draw.