If it was his leg he would brief all these calculations as if they were now final BEFORE THE LOAD SHEET had arrived.......I
- that, in effect, with a buffer added to provisional load sheet figures, is how a 'radio/ACARS load sheet' works.
Everything set&Briefed on provisional + buffer and only changed if actual is more than XXX away from provisional.
As for the last bit.....................