PPRuNe Forums - View Single Post - Engine out terrain clearance
View Single Post
Old 27th Sep 2013, 14:32
  #49 (permalink)  
latetonite
 
Join Date: May 2001
Location: A few degrees South
Posts: 809
Likes: 0
Received 0 Likes on 0 Posts
The reason for posting was that, as operators themselves are responsible for the One Engine Out Procedure for their fleet, I seriously wonder if they take the controllability problem into account.
Many procedures require an immediate turn left or right, at a now standard 15 degrees of bank.
Taken all factors in to the limit, a pilot flying at calculated V2 might run out of rudder while banking, or find himself with a sink rate while increasing the speed to control the aircraft, as VmcA at this bank angle is substantionaly increased.

The referred document explains this very well.
latetonite is offline