I'd prefer to see it written with the full lot of base weather first (eg the initial conditions and the BECMG), followed by the TEMPOs.
This would allow an overview of the base weather for the full period first and then, as you said SARWannabe, the predicted fluctuations in those with the TEMPOs. Seems a clearer way to do it.