"European Police tender being written for one European airframe"
NOTAR Fan,
perhaps you have misunderstood something.
If you have, for arguments sake, 7 airframes of type "ABC" already in use and wish to upgrade the role equipment fitted to them then the required outcome is 7 airframes of type "ABC" with upgraded role equipment and not 7 airframes of type "XYZ" with upgraded role equipment.
PAN hasn't reported much because PAN is not in a position to know much at this stage.
Clear??
Last edited by Fortyodd2; 6th Sep 2013 at 21:26.