PPRuNe Forums - View Single Post - Heli Malongo BP contract
View Single Post
Old 3rd September 2013 | 12:04
  #12 (permalink)  
unstable load
15 Anniversary
 
Joined: Dec 2006
Posts: 854
Likes: 0
From: Here and there...
SAS,
Agreed about the nature of the job, but getting the wheels turning for an Angolan visa/validation etc is a matter of MONTHS not weeks like Nigeria, so if enough leave at the wrong time, the oil co. will get a short, sharp awakening....alas, a tad late.
unstable load is offline  
Reply