At QF as a load controller we were trained to do manual load sheets from day 1. Though some are better than others at them. Since the Melbourne Load Control office was closed and the Sydney one expanded, I'd say that this may be a skill which has diminished within load control.
The experience I had when dealing with flight crews was, that they were either on the ball or had no idea. Unfortunately there wasn't much in between.