Where I work, the procedure when giving a level change is "climb/descend flight level 360, cross waypoint x level" . This has resulted in non english speakers climbing after said waypoint despite giving a good readback of the clearance. I would be much happier if it was "climb now" or "be level before waypoint x" or "be level by time x". Sometimes the standard RT ain't perfect