It's the disparate flight hours (Bond = 167 CHC = 3800) and the fact that the Bond corrosion started from a hole and the CHC corrosion started from moisture trapped by sludge but both led to the same result that leaves me wondering. From day 1, these two failures have been treated as the same under the same investigation. I can't convince myself that approach was not conveniently expeditious.