PPRuNe Forums - View Single Post - EC225
Thread: EC225
View Single Post
Old 13th Jul 2013, 08:42
  #347 (permalink)  
RVDT
 
Join Date: Nov 2006
Location: After all, what’s more important than proving to someone on the internet that they’re wrong? - Manson
Posts: 1,852
Received 58 Likes on 39 Posts
As a spectator and reading the reports -

The primary common denominator in the issue seems to be corrosion.

The crack propagated from the PTFE plug.

AAIB - During one of these tests a crack initiated and propagated from the 4.2 mm diameter hole after it had been deliberately corroded under laboratory conditions prior to the test.
Fatigue life is not a factor so much when you look at the disparity between the fatigue cycles. 167 hours?

MOD 45 and MOD 70 trend happened within ~ 6 hours!

It would seem to me that the corrosion issue needs to be addressed first.

The change in material, higher power, 5 blades and subsequent change in cycle fatigue etc etc are the differences from a Super Puma which doesnt have a problem.

For me there is still a way to go to a conclusion to place the thing back in service.
RVDT is offline