PPRuNe Forums - View Single Post - cat II/cat III RVR minimums
Thread
:
cat II/cat III RVR minimums
View Single Post
27th February 2003 | 14:39
#
7
(
permalink
)
quid
still learning....
Joined:
Jul 1999
Posts:
169
Likes:
0
From:
USA
Our Ops. Specs. (US 121 carrier) require the following:
CAT II - TDZ required and controlling, mid and/or rollout operative but not controlling.
CAT IIIa and b - TDZ and Mid range both required and controlling. Rollout advisory only.
quid
View Public Profile
Find More Posts by quid