PPRuNe Forums - View Single Post - A330 power transfer
View Single Post
Old 31st May 2013 | 15:14
  #2 (permalink)  
mono
 
Joined: Feb 2002
Posts: 554
Likes: 0
From: The Sandpit
With just one electrical power source (not APU) The electrical system load sheds.

Typical shed loads with only one electrical power source are Galleys and IFE.

I would say what you experienced is normal and the only solution is to keep the EXT power connected until the second engine is started or no leave the IFE off and do a manual demo, switching it back on after the second engine generator is on line.
mono is offline  
Reply