Fresh this evening :
Boeing (NYSE: BA) has rolled out of the factory the first 787 Dreamliner to be built at the increased production rate of seven airplanes per month. The airplane, which rolled out earlier this week, is the 114th 787 to be built overall and the 100th 787 to be built at the Everett, Wash., factory.

Boeing's 787 program is on track to achieve a planned 10 per month rate by year-end. The production rate accounts for airplanes built at the Everett Final Assembly facility, the Everett Temporary Surge Line and Boeing South Carolina.

To date, 50 787s have been delivered to eight airlines. The program has more than 800 unfilled orders with 58 customers worldwide.
and :
ANA is to resume services with its Boeing 787 fleet from 1st June, 2013, following the successful completion of a series of battery system modifications, safety checks and test flights. The reintroduction of the 787 aircraft will result in partial amendments to ANA's summer flight schedule for international and domestic services.
ANA will also introduce the Dreamliner onto a further three international routes from this summer – Narita to Beijing and Shanghai and Haneda to Taipei – bringing the number of overseas destinations served by the 787 to five.

Osamu Shinobe, President and CEO of ANA, said “We are pleased to announce that our 787 aircraft will be reintroduced on scheduled flights from June onwards. ANA’s priority is the safety of our passengers. Our engineers have worked closely with Boeing to undertake the required improvements and we are fully satisfied with the safety of our 787 fleet.”