Tis true there is little spare capacity during summer which is a good thing. Should firefighting be required to cover for things like tech issues then load/connections permitting a LHR flight will often be merged freeing up an aircraft. There is usually a plan b, c and d before they get to a hire in which obviously is a last resort due to cost.