For Immediate Release

March 12, 2013
Contact: Laura J. Brown
Phone: (202) 267-3455

WASHINGTON, D.C. – The Federal Aviation Administration (FAA) today approved the Boeing Commercial Airplane Company's certification plan for the redesigned 787 battery system, after thoroughly reviewing Boeing’s proposed modifications and the company’s plan to demonstrate that the system will meet FAA requirements. The certification plan is the first step in the process to evaluate the 787’s return to flight and requires Boeing to conduct extensive testing and analysis to demonstrate compliance with the applicable safety regulations and special conditions.

“This comprehensive series of tests will show us whether the proposed battery improvements will work as designed,” said Transportation Secretary Ray LaHood. “We won’t allow the plane to return to service unless we’re satisfied that the new design ensures the safety of the aircraft and its passengers.”
The FAA will approve the redesign only if the company successfully completes all required tests and analysis to demonstrate the new design complies with FAA requirements. The FAA’s January 16, 2013 airworthiness directive, which required operators to temporarily cease 787 operations, is still in effect, and the FAA is continuing its comprehensive review of the 787 design, production and manufacturing process.
Press Release – FAA Approves Boeing 787 Certification Plan


I doesn't say the battery improvements will allow the 787 to return to service.

The firebox is change to the 787 design and doesn't mean it will fly because of it.

The 787 is a long way from return to service, January 2014 I'd say.