>F uel (pump on, contents sufficient)
R adio (as required)
E ngine (Ts & Ps / 5 Greens)
P ropellor (in climb pitch / full power available)
P arking break (off)
A ltimeter (QFE set)
T ransponder (as required)
C arb heat (hot)
H arnesses (tight & locked)<
That'll be the rejoin checks for the mighty Vigilant, not forgetting the dreaded mute switch as part of the Radio check.
One of our guys is a BA first officer. He reckons the checklist for his 747 is a lot less complicated than that for the Vegemite...