HazelNuts
Thx for clearing that up.
The gross ("actual" as per CS 25.115 terminology) and net notions apply as part of the clearing obstacles process by 35 ft, which is a separate issue from the gross 2.4% requirements for which the 0.8 % penalty would not make sens then.