@kenneth house
- Hull and eebay is at cabin altitude ~6000 feet
- Cells are derated to 4.025V / ~80%SOC
- BCU was not connected to charger / test rig at 2006 incident
- OV/UV is being considered as part of investigation
- Exemplar batteries showing deformation - CT report pg 26, img 22 - of cells are being examined
All the above was already discussed at least once in this thread.
Last edited by saptzae; 12th Mar 2013 at 21:34.
Reason: Fixed cabin alt 6000, Thanks Turin!