PPRuNe Forums - View Single Post - Tower Operations on intersecting runways
View Single Post
Old 28th Feb 2013, 11:49
  #6 (permalink)  
HEATHROW DIRECTOR
 
Join Date: Oct 2000
Location: Berkshire, UK
Age: 79
Posts: 8,268
Likes: 0
Received 0 Likes on 0 Posts
<<What I was trying to get at was how the issuing of clearances work - you clear somebody to land on one runway; will somebody be cleared to land on the other runway at the same time?>>

OK, where I worked I'm thinking in this case of two runways which did not cross, although the extended centrelines did and the ends of the runways were very close. Yes, we would clear aircraft to land on both runways simultaneously. One controller would be dealing with one landing runway and another controller would be dealing with the landings on the other runway plus crossing departures on a third runway.
HEATHROW DIRECTOR is offline