PPRuNe Forums - View Single Post - FAA Grounds 787s
View Single Post
Old 27th February 2013 | 23:22
  #1053 (permalink)  
inetdog
 
Joined: Feb 2013
Posts: 71
Likes: 0
From: Placerville, CA
So if you go EO on the 787...where does the power to op everything come from?
By design, from the APU and the RAT, with the batteries as a backup for essential systems if it comes to that.
The batteries should not be switched onto the main DC bus until after non-essential loads have been switched off. This is an active (solid state) relay and not just a diode isolator.

Last edited by inetdog; 27th February 2013 at 23:24.
inetdog is offline  
Reply