PPRuNe Forums - View Single Post - Fort Fumble and the Money Spend Continues
Old 24th January 2013 | 22:29
  #19 (permalink)  
601
20 Countries Visited
25 Anniversary
 
Joined: Mar 1999
: ATPL
Posts: 1,658
Likes: 153
From: Brisbane, Qld, Australia
A slight thread drift - but along the same lines.

Quote:
The project will amend CAO 29.6 to bring it in line with the policy for helicopter external load operations outlined in the drafting instructions for CASR Part 138.
How can CASA amend a CAO to reflect a draft CASR?

How can you have policy as a basis for a CAO?

I was under the obviously misguided assumption that a CAO must have a head of power in an existing CAR.
601 is offline  
Reply