PPRuNe Forums - View Single Post - Long Range SAR
Thread: Long Range SAR
View Single Post
Old 9th Jan 2013, 06:16
  #55 (permalink)  
GreenKnight121
 
Join Date: Jul 2006
Location: by the Great Salt Lake, USA
Posts: 1,542
Likes: 0
Received 0 Likes on 0 Posts
Lazy Italians.


SAR Program Info
SAR Program Standards and Requirements
Certain standards and requirements have been developed for various components of the Coast Guard’s SAR system.


SAR Readiness: Each Coast Guard unit with a SAR readiness responsibility shall have a suitable SAR resource ready to proceed within 30 minutes of notification of a distress.

SAR Mission Response:
No greater than a two-hour total response time for any one response unit within a Sector or unit’s AOR to arrive at any location within the AOR. This time is calculated from time of notification of the Coast Guard until the time of arrival on scene, including 30 minutes of preparation time (i.e. a total of 90 minutes from underway to on-scene).

Last edited by GreenKnight121; 9th Jan 2013 at 06:17.
GreenKnight121 is offline