Maybe I wasn't clear, you would do the job for €1m by extending the runway alone to 1800m and not widening it. There is already and 300m RESA in situ at the threshold of 03 so that would be a quick and cheap job. No drainage/foundations required as they are already in place. I am hearing the figure of 2288m alot but this was never in the plan for the runway extension, can you show me a link to that?
Phase 2 was always a non runner, something to be thought about in 10-15 years time, something to suggest progression.
CP.