PPRuNe Forums - View Single Post - When is an approach complete?
View Single Post
Old 30th December 2012 | 00:17
  #62 (permalink)  
galaxy flyer
Community Builder
20 Anniversary
 
Joined: Dec 2002
: ATP+Mil
Posts: 3,984
Likes: 568
From: Where the Quaboag River flows, USA
Italia458

Just a personal thought, but when you have to make insults or swipes at people, you're losing the argument. I'd guess (in fact, know) that sterpster has a broad background in approach design and charting. Please tone down the pretentious "I know better" attitude.

You are correct, technically, about the NORDO possibility, but the real world doesn't always work perfectly. In any case, the NORDO aircraft would be "protected" by ATC clearing the airspace, calling for the filed alternate and planning for the NORDO aircraft to fly airways to that alternate.

GF

Last edited by galaxy flyer; 30th December 2012 at 00:23.
galaxy flyer is offline  
Reply