PPRuNe Forums - View Single Post - When are you required to maintain a plotting chart?
Old 27th December 2012 | 15:32
  #34 (permalink)  
galaxy flyer
Community Builder
20 Anniversary
 
Joined: Dec 2002
: ATP+Mil
Posts: 3,984
Likes: 568
From: Where the Quaboag River flows, USA
Flyburg

There have been cases of jets overflying the track system, having to do an emergency descent and triggering TCAS R/As. Most random routes overflying the NATS will cross them at some point. The requirement is to align the aircraft's track with the nearest organized track, offset and then begin the descent, time permitting. I now ask for flight plans above the NATS to follow the routing, if the planned level is above 410.
galaxy flyer is offline