PPRuNe Forums - View Single Post - 747-400 mel 28-22-01
View Single Post
Old 25th Dec 2012, 03:40
  #4 (permalink)  
JammedStab
 
Join Date: Apr 2008
Location: nowhere
Posts: 1
Likes: 0
Received 0 Likes on 0 Posts
Correction made.....

I see 6 different ways of this being deferred, all of which have a maintenance procedure. Perhaps it is country specific depending on CAA approvals. I'll just post the first way...

MEL 28-22-1A

One may be inoperative provided:
a) All main tank 2 and 3 boost pumps operate normally,
b) Main tanks 1 and 4 transfer valves are verified to operate normally,
c) Fuel quantity indicating system for the associated tank operates normally, and
d) The following minimum fuel quantities are retained in the associated tank for the flight conditions shown (normal fuel loading, balance and usage
requirements still apply):

TAKEOFF : 11,002 Kg, LANDING 2,127 kg

OPERATIONS ACTION

NOTE: AFM fuel loading, balance and usage limitations require main tanks 1, 2, 3 and 4 to all have the minimum fuel quantities.

1. For takeoff, minimum amount of fuel in each main tank 1, 2, 3 and 4 is
11,002 kg.

2. For landing, minimum amount of fuel in each main tank 1, 2, 3 and 4 is
2,127 kg.

3. The inoperative fuel pump FUEL PUMP FWD or AFT advisory message
will remain displayed and the low pressure light will be illuminated.

Last edited by JammedStab; 25th Dec 2012 at 06:05.
JammedStab is offline