Of those already mentioned the running order is Viscount with 444, HS748 with 381 (however 89 of these were built in India) and BAC 1-11 with 244 (a handful built in Romania).
The BAe146/RJ, with just under 400 built (though not all delivered) is second to the Viscount, ahead of the 748 and 1-11.