More than that!
We are looking to go from 1 x 737 at MAN now, to 2 X 737s and 2 x 757s. So we need well over 100 extra cabin crew.
At LGW we are going from 4 x 737 and 1 x 767 to 7 x 737 and 3 x 767. Here we need nearly 300 extra cabin crew.
And there will be a base in GLA and we're looking for LCA, 50 needed for each of those.
Check out
www.aviationjobsearch.com for full details.
Good luck!