@ LowObservable well seeing Canada isn't going to place an order till 2014 for 2 trainers delivered 2016, mid 2013 sounds ok for the info they need


@Squirrel 41 obviously you cant open the link, Ill repost it for you, the partners procurement and aquisition price wont be the same as USA because they are eating a lot of the costs on behalf of the partners

http://www.defense-aerospace.com/dae...-3-29-2012.pdf

Page 62 page 65
TY (then year) US dollars for the combined F-35 A,B,C buy to year 2037

The Program Acquisition Unit Cost (PAUC) inc. engine = $161 M

The Procurement Unit Cost (APUC) inc. engine = $137.4 M

BY2012 (base year)

$M US dollars for the combined F-35 A,B,C buy

The Program Acquisition Unit Cost (PAUC) inc. engine = $134.5 M

The Procurement Unit Cost (APUC) inc. engine = $109.1 M

As per
Page 61, F-35 Aircraft Unit Cost Report Page 64 F-35 Engine Unit Cost Report
Average F-35 price over the total buy
F-35 A Unit Recurring Flyaway (URF) Cost inc. engine = $78.7 M

(This is close enough to the 2008 yr $'s of $75m DMO estimate for me, although the Aussie average URF will be slightly less because we are buying in specific years. As per page 39 and 54 (RF/60=URF) for year 2018, the F-35A is $72.5 M URF in BY2012$.)


Average F-35B Unit Recurring Flyaway (URF) Cost inc. engine = $106.5 M


Average F-35C Unit Recurring Flyaway (URF) Cost inc. engine = $87 M

Last edited by JSFfan; 7th Dec 2012 at 14:25.