PPRuNe Forums - View Single Post - Gama engineering
View Single Post
Old 21st November 2012 | 06:27
  #5 (permalink)  
mugwumps
 
Joined: Apr 2011
Posts: 20
Likes: 0
From: South East
Costs are lower than MAGE was charging because of the introduction of the CAFAM system with more accurate estimates,billing etc.Total transparency
because the CAFAM printout is sent to customers.
How can costs be lower when its the same people doing the same work in the same time and the hourly rate under Gama has increased from £40 to £52 per
hour for piston engine types?Any new staff are going to take longer because of training,familiarity etc.
Under MAGE the entire workpack was photocopied and sent to customers.
mugwumps is offline  
Reply