PPRuNe Forums - View Single Post - North Sea heli ditching: Oct 2012
View Single Post
Old 14th Nov 2012, 19:02
  #376 (permalink)  
Lonewolf_50
 
Join Date: Aug 2009
Location: Texas
Age: 64
Posts: 7,224
Received 413 Likes on 257 Posts
The quill shaft had sheared. The other pump I was flying on had 600 hours more than the one that had failed.
The qestion this raises to me was "what were the criteria for inspection the pump (and its piece parts)" to determine the "condition" of the pump.
(PS, is the quill shaft that which drives the pump from the transmission, or is it something else? )

(Aren't you glad there were 2? )

Looks like we are in a bit of thread drift, I'll stop there, even though "shaft failure" looks to be a common theme.

Last edited by Lonewolf_50; 14th Nov 2012 at 19:03.
Lonewolf_50 is offline