The problem with effectively grounding the EC225, even with the EC enhanced monitoring is that there will have to be a very solid reason to rescind the grounding. Without some concrete assurances that this problem is somehow fixed (with a new shaft?) which could take a long time, the EC225 could be having a long rest. In this instance, I think that increased oversight would have been better than a grounding.