For a heavy Category D aircraft landing on say, a 7500 long RW, would the midpoint RVR requirement (I am assuming it IS relevant and controlling in this example) be 150m since the min RVRs for T/O for a Cat D ac are 150/150/150 as opposed to 125/125/125 for Cat C?