the management at cv needs to address cost issues and productivity top down and not the other way..in 2008 -2009 crisis certain members of cv wanted to downsize to 8 aircraft,fortunately one vp maintained that a 14 a/c fleet would survive and consequently this proved correct with a return to profits when others were suffering. if the arabs go there will others more than willing to fill the gap.. believe me..