PPRuNe Forums - View Single Post - STANSTED - 2
Thread: STANSTED - 2
View Single Post
Old 17th Oct 2012, 07:46
  #1823 (permalink)  
answer=42

mostly harmless
 
Join Date: Aug 2002
Location: axis of chocolate
Posts: 189
Received 0 Likes on 0 Posts
@LGS6753
It depends on what you mean by 'substantially'. There was an outline plan to add an extra track for a critical stretch in North London of the London Liverpool Street - Stansted rail line. This would have reduced journey times to Stansted Airport by approx 5-10 minutes and added the capacity for more trains. However, the plan has been shelved for the next 5 years, due no doubt to the decline in Stansted Airport passengers.

There is also the possibility to add a second tunnel and track into the airport, which would again decrease travel times marginally and add capacity. This would need funding from the airport.

Beyond that, there are pie / sky 'thoughts' for a hispeed rail line to Stansted / Cambridge. Not before 2050, I would think.

Last edited by answer=42; 17th Oct 2012 at 07:47.
answer=42 is offline