PPRuNe Forums - View Single Post - Slinging a pylon to site
View Single Post
Old 5th Oct 2012, 07:50
  #20 (permalink)  
Flyting
 
Join Date: Apr 2006
Location: In the mountains
Posts: 444
Likes: 0
Received 3 Likes on 3 Posts
...and central Africa. There is road access but that means a 5-10 day, long way around to get there if you are lucky...

P.S. 170': the frame is made with angle iron bolted together. 4 legged with diagonal cross pieces for strengthening. I will post a pic of the next sling.

Top piece, I will try attaching the sling at the top point and see how that goes... Let you all know next week.
Flyting is offline