PPRuNe Forums - View Single Post - Dealing with Difficult Designers
View Single Post
Old 15th January 2003 | 22:15
  #3 (permalink)  
Mad (Flt) Scientist
20 Anniversary
 
Joined: Sep 2002
Posts: 2,188
Likes: 6
From: La Belle Province
Try not to forget, however, that infallability is not granted to pilots and FTEs either; nothing will get the engineering organisation determined to override FT input than a test organisation which thinks it can do everyone else's jobs better than they can.

The key is to work as a team, not as FT vs design/engineering. Everyone - even project management (blasphemy ) has something they can contribute.
Mad (Flt) Scientist is offline